Date: 20 Jun 2017
Cat:

A3 Highway SA-RC – Site No.2

Work Detail: Design and realization of plants for the following macro-lots of the Highway Salerno-Reggio Calabria:

Macro-lot 2, between km 108+000 and km 139+000;

Macro-lot 3.2, between km 153+400 and km 173+900;

Macro-lot 3.3, between km 173+900 and km 185+000.